FTN design & development specification (D&D)
SP FTN (D&D) 008
Network Design Manual for Optical Fibre
Issue 4.2, Feb 2009 · FTN D&D specs & typical drawings
The core fibre design manual for the FTN: how Core and Access Nodes connect, where joints and spurs go, which fibres and tubes are allocated to what, resilience rules and how to work out the loss budget. Essential for anyone producing a detailed fibre design.
Clause map — what each clause deals with
| 1 | Introduction | Why the manual exists: consistent fibre design principles for designers producing the detailed FTN fibre design. |
| 2 | Abbreviations | Acronym list (ADM, BTS, DBS, DI-SAC, HLD, PMux, REB, STM-1, STM-16, UTX etc.). |
| 3 | Glossary | Definitions of key terms: Access Node SR/DR, Core Node, fibre section and sub-section, spliceless joint, green zone, touch potential, Network End/User End. |
| 4 | Scope | Who must follow the manual, mandatory status, and the Technical Clarification and Design Concession routes for departures. |
| 5 | Safety | Designer's duty not to introduce new hazards when applying the manual. |
| 6 | Connectivity & Interfaces | Interfaces with other rail projects and PTOs needed to close transmission rings; info supplied by Network Rail. |
| 7 | FTN Architecture | Overview of the SDH ring-based FTN and its node types. |
| 7.1 | General Principles | Ring topology, the 17 node types grouped into Core and Access, and dedicating tubes in a 24-fibre cable to core or access traffic. |
| 7.2 | Core Nodes | Role of Core Nodes as the key interfacing points between transmission rings. |
| 7.3 | Access Nodes | What Access Nodes do and the split into SR (single route, one ADM) and DR (diverse routes, multiple ADMs), with the node Types each covers. |
| 7.4 | GSM-R Repeaters | How tunnel and in-fill repeaters link to a hub over fibre: single-fibre working, back-up fibre, pulled bundled fibre, FC/APC pigtails, green patchcords, dedicated cables. |
| 8 | Surveying Requirements | What the fibre survey must capture in addition to SP/FTN(SU)/001: lengths, joint positions, crossing joints, sheath gaps, spurs, terminations, route separation, building entries. |
| 8.1 | Centre to centre cable lengths | How cable lengths between joints are measured and the allowances added for deviation, jointing and termination; rule that cables terminate at nodes not joints. |
| 8.2 | Joint Locations | Nominal joint spacing and concession limit, green zone siting, joint bays, tunnel mouth joints, spliceless joints near stations and level crossings for CCTV, DI-SAC differences. |
| 8.3 | Sheath Gaps | Why metallic sheaths are gapped to control traction voltages; points to SP/FTN(D&D)/005 for the detail. |
| 8.4 | Core Node Sites | Core Nodes need physically diverse cables into buildings or REBs, meeting the resilience rules in section 14. |
| 8.5 | Access Node Sites | Spur cable arrangements for SR and DR Access Nodes, the Stakka box and temporary closure arrangement where the node is not yet built, survey allowances. |
| 8.6 | Choice of Cable Type | The four cable types (duct, armoured, ZHLS, DI-SAC), what each is for, and the environment-to-cable-type selection table including subsurface stations and building entries. |
| 9 | Fibre Cabling Arrangements | How fibre cables are arranged at joints, terminations and node sites. |
| 9.1 | General | Use the same Network Rail nominated components everywhere; arrangements vary with node type and resilience. |
| 9.2 | Optical Joint Closures | The free-issued joint closure kit (FIST GCO2 with SOSA2 trays) and where closures are housed. |
| 9.3 | Optical Terminations | The free-issued termination kit (Splice UK, to 011), its pigtails to 012, and the housings terminations go in. |
| 9.4 | Core Nodes | Core Node purpose, separate building entries per cable, dedicated tube per Core-to-Core link with spare pair retained, minimum splices. |
| 9.5 | Access Nodes | Access Node functions, daisy-chaining between Core Nodes, when a second fibre pair or tube is needed (Figures 1 to 3), spur splicing and spliceless joints. |
| 9.6 | Connection of Transmission Nodes After Cable Commissioning | Connecting a node whose position moved after cable installation: extended spur up to a limit, or inserting a new cable length with two joints. |
| 10 | Optical Fibre Splicing Arrangements | Network Rail's splicing requirements at joints and terminations, read with Appendix C drawings. |
| 10.1 | General | Scope of the splicing section and link to Appendix C. |
| 10.2 | Through Joints | Like-to-like splicing by colour and tube at straight joints; DI-SAC to standard cable follows the Appendix D schedule. |
| 10.3 | Spur Joints | Definition of a spur joint, how many tubes are spliced for each Access Node type, and the tube 3 arrangement for tunnel repeater spurs. |
| 10.4 | Terminations at Core Nodes | All fibres spliced to tuned SC/APC pigtails at Core Nodes; drawing reference. |
| 10.5 | Terminations at Access Nodes | Only selected fibres terminated at Access Nodes, use of ODF Connectivity Drawings to place fibres on the right trays, and back-splicing in temporary closures. |
| 11 | Accommodation | Where fibre cables, joints and terminations are housed. |
| 11.1 | Optical Fibre Cable | Cables (other than DI-SAC) go in the lineside route built or refurbished to 004 and 007. |
| 11.2 | Optical Fibre Joints | Joints in re-enterable dome closures in perpendicular joint bays per SU/001 and 004. |
| 11.3 | Optical Fibre terminations | Termination kits, pigtails and the housings (trackside cabinets, REBs, buildings) used for terminations. |
| 12 | Detailed Optical Fibre Designs | What a detailed fibre design must contain: all terminations, splices and cables on a line diagram with numbers, distances and losses; sample in App B. |
| 12.1 | Controlling Undesirable Effects of Electrification Currents | Touch potential control for fibre cables: keep metallic elements earth-free by gapping armour and isolating moisture barriers and strength members, per 005. |
| 13 | Allocation of Fibres | The standard fibre and tube allocation table for 24-fibre cables (access traffic, second ADM, repeaters, CCTV, core rings and spares); no departures without concession. |
| 13.1 | Allocation of Fibres for GSM-R Tunnel and In-fill Repeaters | Which fibres and tubes feed each numbered repeater in main cable and DI-SAC, and allocations for a dedicated repeater cable. |
| 14 | Resilience | Rules to avoid common mode failures: separate building entries per cable, PTO entries, minimum separation between entries and between FTN cables, ducted alternative with concession. |
| 15 | Loss Budget | How to calculate and check optical loss on sections and sub-sections. |
| 15.1 | General | What the loss budget is, factors affecting loss, and the maximum link loss at 1550 nm beyond which clarification is needed. |
| 15.2 | Optical cable attenuation | Cable/fibre supplier, and the per-km attenuation figure to use in calculations. |
| 15.3 | Splice Loss | Definition of splice loss as a bidirectional mean; allowances and testing are in 005. |
| 15.4 | Connector Loss | Definition of connector loss and the design figure to use. |
| 15.5 | Calculation of expected section loss | Formula table for Core-to-Core section loss: fibre km, splices and connector pairs. |
| 15.6 | Calculation of expected sub-section loss | Formula table for Access Node sub-section loss. |
| 15.7 | Calculation of expected section loss with temporary back splices | How back-spliced spur cables add loss (double spur length, extra splices, Access Node connectors) and the formula table. |
| 16 | Labelling, Numbering and As-Built Records | Label fibre elements to the FTN Numbering Plan (016) and compile as-builts to 017. |
| 17 | Standards | List of referenced FTN specs and standards. |
| App A | Typical Fibre Cabling Arrangements | Drawing list for typical cabling at Access Node, Core Node, MSC and Type 15 sites, including junctions and node-not-ready cases. |
| App B | Fibre Section Sample Drawing | Reference to the sample detailed design drawing DR/FTN(D&D)/013. |
| App C | Fibre Splicing Diagrams | Drawing list for spur, back splice, termination, DI-SAC and GSM-R repeater splicing arrangements, plus generic ODF connectivity drawings. |
| App D | Double Insulated Super Armoured Cable (DI-SAC) | DI-SAC construction, bend radius, joint spacing rules, sheath gap need, installation summary, two-tube fibre colour code, tube labelling and the cross-splicing schedule to standard cable. |
| App E | Generic ODF Connectivity Drawings | Generic ODF connectivity drawings for Type 16 nodes (drawings only, no text). |
Standards this one points to
- DR FTN (D&D) 003
- DR FTN (D&D) 004
- DR FTN (D&D) 005
- DR FTN (D&D) 006
- DR FTN (D&D) 007
- DR FTN (D&D) 008
- DR FTN (D&D) 009
- DR FTN (D&D) 010
- DR FTN (D&D) 011
- DR FTN (D&D) 012
- DR FTN (D&D) 013
- DR FTN (D&D) 014
- DR FTN (D&D) 018
- DR FTN (D&D) 019
- DR FTN (D&D) 021
- DR FTN (D&D) 057
- DR FTN (D&D) 058
- DR FTN (D&D) 059
- SP FTN (D&D) 005
- SP FTN (SU) 001
- SP FTN (D&D) 004
- SP FTN (D&D) 012
- SP FTN (D&D) 010
- SP FTN (D&D) 007
- SP FTN (D&D) 011
- SP FTN (D&D) 016
- SP FTN (D&D) 017
- SP FTN (D&D) 003