FTN typical drawing (D&D)
DR FTN (D&D) 012
Fibre Cabling Arrangement at Access Node, SR Site Before Node is Ready
Issue 2
What the drawing shows
Interim arrangement where the trunk is installed and spurred before the node equipment exists: how the fibres are parked at the ODF.
Typical drawings are a starting point: the project design, the site survey and the current standards decide what is actually built.