onestop

FTN typical drawing (D&D)

DR FTN (D&D) 014

Fibre Termination Arrangement at a Core Node

Issue 2

What the drawing shows

How trunk fibres are terminated and presented at a core node ODF: tray allocation and patching to equipment.

Typical drawings are a starting point: the project design, the site survey and the current standards decide what is actually built.

Standards this one points to