FTN typical drawing (D&D)
DR FTN (D&D) 008
Fibre Cabling Arrangement at Access Node, SR Site at a Junction
Issue 2
What the drawing shows
Access node at a junction where more than one trunk route meets, showing how each route is brought to the ODF.
Typical drawings are a starting point: the project design, the site survey and the current standards decide what is actually built.