onestop

FTN typical drawing (D&D)

DR FTN (D&D) 018

Fibre Cabling Arrangement at Access Node, DR Site

Issue 2

What the drawing shows

Access node at a distribution-ring (DR) site: trunk, spur and ODF arrangement.

Typical drawings are a starting point: the project design, the site survey and the current standards decide what is actually built.

Standards this one points to