onestop

FTN design & development specification (D&D)

SP FTN (D&D) 009

Network Design Manual for Copper Cable

Issue 4.5, Feb 2009 · FTN D&D specs & typical drawings

The FTN copper cable design manual: how a designer sizes, routes and immunises lineside copper sections between nodes, where cabinets and BOPs go, pair allocation and DSL limits in AC, DC and non-electrified areas.

Clause map — what each clause deals with

1IntroductionPurpose of the manual, who does detailed copper design, and the rule that conductors run continuous point to point with no spurs.
2AbbreviationsAcronym list (BOP, BT, DBS, DRR, SRR, FTE, RC, TSC, VL, VT etc.).
3GlossaryDefinitions of copper section, half-section, stub cable, tail cable, Db Colo cable, touch potential, return rail/conductor and node types.
4ScopeMandatory status of the manual; applies to non-electrified, DC and AC areas; copper only where DSL or lineside services need it.
5SafetyDesigner's duty not to import new safety hazards.
6Connectivity and InterfacesInterfaces with other rail projects and PTOs, expected to be at optical rather than copper level.
7FTN ArchitectureOverview of the SDH ring network and the role of copper for lineside services and DSL on non-fibred lines.
7.1The Copper Cable NetworkWhen stub cables are allowed (branch lines, rail return, tunnels, islands, node moves), why conductor size matters, and what a copper island is.
8System PlanningHow the manual's sections apply depending on fibre presence and traction type.
8.1Lines With Optical Fibre CableConcept sketch for a fibred section: circuits on fibre, copper only for lineside services.
8.2Lines Without Optical Fibre CableConcept sketch for a non-fibred section with HDSL carrying 2 Mbit/s over the copper.
8.3Copper Islands With No Mid-Section ServicesIsland arrangement where no through copper is needed because nothing sits mid-section.
8.4Copper Islands With Mid-Section Services Fed by TEHIsland arrangement using a mid-section TEH to feed services; who to tell about TEH requirements.
9Traction Electrification Systems and Their Effects on Copper CablesBackground on how DC and AC traction supplies create interference and shock risk in telecoms cables.
9.1DC Traction ElectrificationHow DC traction is fed from substations via the E&P route and why it differs from AC.
9.1.1Third Rail DC Traction ElectrificationHow third rail supply and return work and how to recognise it on site.
9.1.2Fourth Rail DC Traction ElectrificationLUL fourth rail system and how to recognise it.
9.1.3Overhead DC Traction ElectrificationTram overhead DC systems; seek technical clarification when fourth rail or overhead DC is met.
9.1.4Undesirable Effects in DC Electrified AreasThe two effects (touch potential, noise) and four sources of them in DC areas.
9.1.5Control of Undesirable Effects in DC Electrified AreasControl measures: earth-free armour, gapped sheaths, isolated moisture barriers, separation, limiting HV parallel runs, screening conductors.
9.2AC Traction ElectrificationHow 25 kV OHLE feeds trains via pantograph and returns through rails (figure).
9.2.1The Power Supply and Distribution SystemFeeder stations, neutral sections, boundary and mid-section TSCs, feeder section lengths and emergency feeding.
9.2.2Rail Return AC Traction Electrification SystemsSingle and double rail return, why SRR is common, and why rail return induces most into cables.
9.2.3Return Conductor and Booster TransformersSuppression at source using RC and BTs, their spacing, return bonds, and the effect of a BT outage.
9.2.4Return-Conductor-Only SystemsRC without BTs is treated as rail return for design; note on where to see electrification types side by side.
9.2.5Undesirable Effects in AC Electrified AreasThe two effects and three sources in AC areas, introducing longitudinal (VL) and transverse (VT) induced voltage.
9.2.6Control of Undesirable Effects in AC Electrified AreasControl measures plus the long list of parameters affecting immunisation and which ones the FTN can influence; continuous cable length is key.
9.3ImmunisationElectromagnetic induction explained with figures showing induction from return rail and the benefit of a return conductor.
9.3.1Physical SeparationSeparation distance as an immunisation method and why it is often impractical on existing routes.
9.3.2Limiting LengthLimiting continuous copper length via node spacing and half-sections; the maximum continuous length in RC/BT areas and who to notify.
9.3.3Self Screened Telecoms CablesWhy older self-screened cables are not used on the FTN.
9.3.4Separate Screening ConductorsWhat a screening conductor is, how it cancels induced current (figures), survey of existing ones and repair/replacement duties.
9.3.5Electrical Testing to Confirm Suitable ImmunisationCommissioning and periodic immunisation tests and which specs govern them.
10Survey RequirementsPointer only: survey content moved to the survey specification.
11Components of the Copper NetworkOverview of cables, joints, cabinets and termination practice used on the copper network.
11.1Copper CablesCable types, pair counts and conductor sizes available, and reuse of existing cables.
11.1.1Main CablesFree-issued main cables, drum lengths, designer's duty to size pairs using survey, GOU, records and CAMS; handling cables in service.
11.1.1.1Cable SheathWhich sheath type is used generally and which in sub-surface stations and tunnels.
11.1.1.2Test SpecificationPointer to the copper cable test spec.
11.1.1.3DSL Line Attenuation TestSets insertion loss and NEXT limits for DSL pairs and the regenerator spacing limits by conductor size.
11.1.2Jumper WireJumper wire standard, colour code for general versus special circuits, A-leg designation, and replacing through jumpers for DSL.
11.2Joint ClosuresWhen copper joints are permitted, the crimp connector and heatshrink closure used, and joint bay requirements.
11.3Distribution CabinetsSiting cabinets and BOPs from survey, and a table of when a fast transient earth or bonding is needed based on nearby conducting bodies.
11.4Termination PracticeTerminations are free-issued and done to the jointing and terminating spec.
11.4.1Terminations in Environments with No Climate ControlWhich termination module was selected for unconditioned cabinets after environmental testing.
11.4.2Terminations in Environments with Climate ControlWhich 10-pair IDC module is used in climate-controlled housings.
12AccommodationWhere copper terminates at each type of site and the rules that apply there.
12.1Core NodesMDF termination in core nodes, one cable per route, no cable-to-cable jumpers, sheath gapping.
12.1.1EarthingPointer to the earthing details in the jointing/terminating spec.
12.2Access NodesTerminations in ATEHs and REBs, no cable-to-cable jumpers, no tail distribution from ATEHs, capping and coiling cables when the node is late.
12.3Distribution Cabinets and BOPsCabinet and BOP variants, pre-tailed BOPs, siting to keep tails short, through jumpering, and UP/DOWN cable to vertical A/B including mileage changes.
12.4Repeater HousingsHousings for DSL repeaters attached to cabinets and their nominal distance from a node.
12.5Tunnel Termination BoxesWall-mounted boxes in long tunnels for terminating 10-pair tails and feeding tunnel services.
13Detailed Copper DesignThe core design rules a designer applies per copper section.
13.1GeneralOne detailed design per copper section, based on survey data; copper only where needed.
13.2Design Parameters to Control Undesirable Effects in DC Electrified AreasDC rules: route side relative to traction cables, crossing clearance, armour gapping, moisture barrier continuity, earth rod exclusion zones, insulated connectors.
13.3Design Parameters to Control Undesirable Effects in AC Electrified Areas Using Rail ReturnRail return rules: short armour lengths, isolated moisture barriers, separation, half-sections not bridged (figure), cabinet siting, earth rod zones.
13.4Design Parameters to Control Undesirable Effects in AC Electrified Areas with Return Conductor and Booster TransformersRC/BT rules: as rail return plus a requirement for an earthed screening conductor in the route.
13.4.7Hot Wire WorkingWhy all AC-area telecoms plant is treated as live, and the working practices the design must call for.
13.5ResilienceSuccessive and adjacent feeding of SPTs so some survive a cable cut; reference drawing and waiver route.
13.6Choice of Cable TypePair count and conductor diameter stay constant through a section; principles for choosing them.
13.6.1Cable Pair CountTable of pairs needed per lineside circuit type and table mapping total pairs to cable size, with a worked example.
13.6.2Conductor DiameterSection length threshold for choosing 0.63 or 0.9 mm, with exceptions for mid-section signal boxes and long DSL regenerator sections.
13.7Design OutputDetailed design document per section to the engineering spec.
13.8Copper IslandsConditions that must all be met before a copper island is considered, then the commercial comparison and pair sizing for islands.
14Sections Required to Support DSL TrafficWhat a DSL system and regenerator section are and the maximum regenerator sections per cable section.
15Allocation of Cable PairsStandard pair allocations on new cables.
15.1GeneralWhy standard allocations exist and that designers must know them.
15.2Pairs for DSL TrafficTable of which pair numbers each DSL system takes in 50, 30 and 10 pair cables.
15.3Immunisation Test PairsLast two pairs reserved as VT and VL test pairs in AC areas, with the far-end termination arrangement and near-end location.
16Migration PhaseCircuit transfer is a later phase; design must facilitate it.
17Directly Buried Sub-duct (DBS)Pointer to where DBS use is set out.
18RecordsTest results and as-built records to be specified in the design.
19StandardsList of referenced standards and FTN specs.
App ADrawingsList of typical copper section drawings for fibred/non-fibred AC/DC lines, SPT feeding and cabinet termination.

Standards this one points to