The FTN copper cable design manual: how a designer sizes, routes and immunises lineside copper sections between nodes, where cabinets and BOPs go, pair allocation and DSL limits in AC, DC and non-electrified areas.
Clause map — what each clause deals with
| 1 | Introduction | Purpose of the manual, who does detailed copper design, and the rule that conductors run continuous point to point with no spurs. |
| 2 | Abbreviations | Acronym list (BOP, BT, DBS, DRR, SRR, FTE, RC, TSC, VL, VT etc.). |
| 3 | Glossary | Definitions of copper section, half-section, stub cable, tail cable, Db Colo cable, touch potential, return rail/conductor and node types. |
| 4 | Scope | Mandatory status of the manual; applies to non-electrified, DC and AC areas; copper only where DSL or lineside services need it. |
| 5 | Safety | Designer's duty not to import new safety hazards. |
| 6 | Connectivity and Interfaces | Interfaces with other rail projects and PTOs, expected to be at optical rather than copper level. |
| 7 | FTN Architecture | Overview of the SDH ring network and the role of copper for lineside services and DSL on non-fibred lines. |
| 7.1 | The Copper Cable Network | When stub cables are allowed (branch lines, rail return, tunnels, islands, node moves), why conductor size matters, and what a copper island is. |
| 8 | System Planning | How the manual's sections apply depending on fibre presence and traction type. |
| 8.1 | Lines With Optical Fibre Cable | Concept sketch for a fibred section: circuits on fibre, copper only for lineside services. |
| 8.2 | Lines Without Optical Fibre Cable | Concept sketch for a non-fibred section with HDSL carrying 2 Mbit/s over the copper. |
| 8.3 | Copper Islands With No Mid-Section Services | Island arrangement where no through copper is needed because nothing sits mid-section. |
| 8.4 | Copper Islands With Mid-Section Services Fed by TEH | Island arrangement using a mid-section TEH to feed services; who to tell about TEH requirements. |
| 9 | Traction Electrification Systems and Their Effects on Copper Cables | Background on how DC and AC traction supplies create interference and shock risk in telecoms cables. |
| 9.1 | DC Traction Electrification | How DC traction is fed from substations via the E&P route and why it differs from AC. |
| 9.1.1 | Third Rail DC Traction Electrification | How third rail supply and return work and how to recognise it on site. |
| 9.1.2 | Fourth Rail DC Traction Electrification | LUL fourth rail system and how to recognise it. |
| 9.1.3 | Overhead DC Traction Electrification | Tram overhead DC systems; seek technical clarification when fourth rail or overhead DC is met. |
| 9.1.4 | Undesirable Effects in DC Electrified Areas | The two effects (touch potential, noise) and four sources of them in DC areas. |
| 9.1.5 | Control of Undesirable Effects in DC Electrified Areas | Control measures: earth-free armour, gapped sheaths, isolated moisture barriers, separation, limiting HV parallel runs, screening conductors. |
| 9.2 | AC Traction Electrification | How 25 kV OHLE feeds trains via pantograph and returns through rails (figure). |
| 9.2.1 | The Power Supply and Distribution System | Feeder stations, neutral sections, boundary and mid-section TSCs, feeder section lengths and emergency feeding. |
| 9.2.2 | Rail Return AC Traction Electrification Systems | Single and double rail return, why SRR is common, and why rail return induces most into cables. |
| 9.2.3 | Return Conductor and Booster Transformers | Suppression at source using RC and BTs, their spacing, return bonds, and the effect of a BT outage. |
| 9.2.4 | Return-Conductor-Only Systems | RC without BTs is treated as rail return for design; note on where to see electrification types side by side. |
| 9.2.5 | Undesirable Effects in AC Electrified Areas | The two effects and three sources in AC areas, introducing longitudinal (VL) and transverse (VT) induced voltage. |
| 9.2.6 | Control of Undesirable Effects in AC Electrified Areas | Control measures plus the long list of parameters affecting immunisation and which ones the FTN can influence; continuous cable length is key. |
| 9.3 | Immunisation | Electromagnetic induction explained with figures showing induction from return rail and the benefit of a return conductor. |
| 9.3.1 | Physical Separation | Separation distance as an immunisation method and why it is often impractical on existing routes. |
| 9.3.2 | Limiting Length | Limiting continuous copper length via node spacing and half-sections; the maximum continuous length in RC/BT areas and who to notify. |
| 9.3.3 | Self Screened Telecoms Cables | Why older self-screened cables are not used on the FTN. |
| 9.3.4 | Separate Screening Conductors | What a screening conductor is, how it cancels induced current (figures), survey of existing ones and repair/replacement duties. |
| 9.3.5 | Electrical Testing to Confirm Suitable Immunisation | Commissioning and periodic immunisation tests and which specs govern them. |
| 10 | Survey Requirements | Pointer only: survey content moved to the survey specification. |
| 11 | Components of the Copper Network | Overview of cables, joints, cabinets and termination practice used on the copper network. |
| 11.1 | Copper Cables | Cable types, pair counts and conductor sizes available, and reuse of existing cables. |
| 11.1.1 | Main Cables | Free-issued main cables, drum lengths, designer's duty to size pairs using survey, GOU, records and CAMS; handling cables in service. |
| 11.1.1.1 | Cable Sheath | Which sheath type is used generally and which in sub-surface stations and tunnels. |
| 11.1.1.2 | Test Specification | Pointer to the copper cable test spec. |
| 11.1.1.3 | DSL Line Attenuation Test | Sets insertion loss and NEXT limits for DSL pairs and the regenerator spacing limits by conductor size. |
| 11.1.2 | Jumper Wire | Jumper wire standard, colour code for general versus special circuits, A-leg designation, and replacing through jumpers for DSL. |
| 11.2 | Joint Closures | When copper joints are permitted, the crimp connector and heatshrink closure used, and joint bay requirements. |
| 11.3 | Distribution Cabinets | Siting cabinets and BOPs from survey, and a table of when a fast transient earth or bonding is needed based on nearby conducting bodies. |
| 11.4 | Termination Practice | Terminations are free-issued and done to the jointing and terminating spec. |
| 11.4.1 | Terminations in Environments with No Climate Control | Which termination module was selected for unconditioned cabinets after environmental testing. |
| 11.4.2 | Terminations in Environments with Climate Control | Which 10-pair IDC module is used in climate-controlled housings. |
| 12 | Accommodation | Where copper terminates at each type of site and the rules that apply there. |
| 12.1 | Core Nodes | MDF termination in core nodes, one cable per route, no cable-to-cable jumpers, sheath gapping. |
| 12.1.1 | Earthing | Pointer to the earthing details in the jointing/terminating spec. |
| 12.2 | Access Nodes | Terminations in ATEHs and REBs, no cable-to-cable jumpers, no tail distribution from ATEHs, capping and coiling cables when the node is late. |
| 12.3 | Distribution Cabinets and BOPs | Cabinet and BOP variants, pre-tailed BOPs, siting to keep tails short, through jumpering, and UP/DOWN cable to vertical A/B including mileage changes. |
| 12.4 | Repeater Housings | Housings for DSL repeaters attached to cabinets and their nominal distance from a node. |
| 12.5 | Tunnel Termination Boxes | Wall-mounted boxes in long tunnels for terminating 10-pair tails and feeding tunnel services. |
| 13 | Detailed Copper Design | The core design rules a designer applies per copper section. |
| 13.1 | General | One detailed design per copper section, based on survey data; copper only where needed. |
| 13.2 | Design Parameters to Control Undesirable Effects in DC Electrified Areas | DC rules: route side relative to traction cables, crossing clearance, armour gapping, moisture barrier continuity, earth rod exclusion zones, insulated connectors. |
| 13.3 | Design Parameters to Control Undesirable Effects in AC Electrified Areas Using Rail Return | Rail return rules: short armour lengths, isolated moisture barriers, separation, half-sections not bridged (figure), cabinet siting, earth rod zones. |
| 13.4 | Design Parameters to Control Undesirable Effects in AC Electrified Areas with Return Conductor and Booster Transformers | RC/BT rules: as rail return plus a requirement for an earthed screening conductor in the route. |
| 13.4.7 | Hot Wire Working | Why all AC-area telecoms plant is treated as live, and the working practices the design must call for. |
| 13.5 | Resilience | Successive and adjacent feeding of SPTs so some survive a cable cut; reference drawing and waiver route. |
| 13.6 | Choice of Cable Type | Pair count and conductor diameter stay constant through a section; principles for choosing them. |
| 13.6.1 | Cable Pair Count | Table of pairs needed per lineside circuit type and table mapping total pairs to cable size, with a worked example. |
| 13.6.2 | Conductor Diameter | Section length threshold for choosing 0.63 or 0.9 mm, with exceptions for mid-section signal boxes and long DSL regenerator sections. |
| 13.7 | Design Output | Detailed design document per section to the engineering spec. |
| 13.8 | Copper Islands | Conditions that must all be met before a copper island is considered, then the commercial comparison and pair sizing for islands. |
| 14 | Sections Required to Support DSL Traffic | What a DSL system and regenerator section are and the maximum regenerator sections per cable section. |
| 15 | Allocation of Cable Pairs | Standard pair allocations on new cables. |
| 15.1 | General | Why standard allocations exist and that designers must know them. |
| 15.2 | Pairs for DSL Traffic | Table of which pair numbers each DSL system takes in 50, 30 and 10 pair cables. |
| 15.3 | Immunisation Test Pairs | Last two pairs reserved as VT and VL test pairs in AC areas, with the far-end termination arrangement and near-end location. |
| 16 | Migration Phase | Circuit transfer is a later phase; design must facilitate it. |
| 17 | Directly Buried Sub-duct (DBS) | Pointer to where DBS use is set out. |
| 18 | Records | Test results and as-built records to be specified in the design. |
| 19 | Standards | List of referenced standards and FTN specs. |
| App A | Drawings | List of typical copper section drawings for fibred/non-fibred AC/DC lines, SPT feeding and cabinet termination. |