Rail Telecoms One Stop

Level 2 specification

NR/L2/TEL/31200

Design of High-Capacity Fibre Cable Systems

Issue 1, 04 December 2021 · Fibre design

Clause map — what each clause deals with

1PurposeWhat the standard is for: principles for building, extending or maintaining NR's high-capacity (ribbon) fibre network
2ScopeWhat it covers: HCFC cabling parameters and configuration
3Roles and responsibilitiesWho is accountable for competent design and survey
4Definitions and AbbreviationsAbbreviations and definitions (DISAF, S-ODF, N-ODF, ribbon and so on)
5.1Fibre ArchitectureHow HCFC sits alongside the 24-fibre FTN architecture
5.2Ribbon Fibre CablesWhat ribbon fibre cable is and why it is used
5.3Segmentation ODFs (S-ODFs)Segmentation ODFs — how they split the cable into sections for flexibility
5.4Continuity Ribbons, Utility Ribbons, and Nodal-ODFsContinuity and utility ribbons and nodal ODFs — managing connector loss along the path
6.1Minimising Optical Loss Through Maximising Straight Joint SpacingWhy straight joints are spaced as far apart as possible
6.2Information Needed to Assist Design DecisionsWhat information the designer needs to size the cable for future demand
7.1High Capacity Fibre CablesHow HCFC differs from the loose-tube cables of FTN/FTNx
7.3.1IntroductionChoosing the HCFC size from demand information
7.3.2Urban and Rural Weighting GuidanceWeighting fibre demand for urban, town and rural areas
7.4The HCFC NetworkWhere an N-ODF is required when sheaths meet
8.1General Surveying RequirementsWhat the HCFC survey has to establish
8.2Centre to Centre Cable LengthsMeasuring centre-to-centre lengths and maximising joint spacing
8.3Straight Joint locationsChoosing straight joint locations
8.4Sheath gapsRecording sheath gaps; points to 30162
8.5.1GeneralThe HCFC cable variants the surveyor records
8.5.2PE sheathed steel tape armoured HCFCPE-sheathed armoured HCFC — the default, and the limit on how far it may run into a building before ZHLS
8.5.3ZHLS sheathed steel tape armoured cablesZHLS (low smoke) HCFC — subsurface stations, long tunnels, and buildings where the internal run from entry to termination is long
8.5.5Choice of cable typeThe environment-to-cable-type table for HCFC
9ResilienceResilience considerations for the HCFC network
10Fibre RecordsWhere fibre records go and which records standard applies

Standards this one points to