NR/L2/TEL/30179

Design of Fibre Distribution Systems and Fibre End-User Connections

Issue 1, 04 December 2021 · Fibre design

Clause map — what each clause deals with

1PurposeWhat the standard is for: how end users are connected to NR's fibre without harming trunk capacity
2ScopeWho it applies to: anyone designing or building NTPs, distribution systems or end-user fibre connections
3Roles and responsibilitiesWho is accountable for competent design and survey
4Definitions and AbbreviationsAbbreviations and definitions (FIP, FAT, NTP, S-ODF and so on)
5.1GeneralOverview of NR's fibre asset — FTN and HCFC
5.2Ancillary InformationBackground on why the 24-fibre FTN cannot carry everything
6.1HCFC ArchitectureHow the HCFC trunk architecture is meant to be exploited by distribution systems
6.2Distribution Systems ArchitectureWhen a distribution system is used versus a direct connection at a joint or S-ODF
7.1GeneralThe rule that end-user fibres are never fusion-spliced to trunk or spur cables — demountable connections only
7.2.1GeneralFibre Interface Points — the pluggable connection between end user and trunk
7.2.2FATsFibre Access Terminals for external end-user connections
8.1GeneralWhat a distribution system consists of — cables between a joint/S-ODF and the NTPs
8.2.1GeneralWhen a direct connection is used instead of a spur or distribution cable
8.2.2Spur CablesSpur cables — where they are laid and what they connect into
8.2.3Distribution cablesDistribution cables — connected at both ends into existing joints/ODFs
8.3Network Termination Points (NTPs)Network Termination Points — the demarcation at the end of NR's fibre
8.5Guidance on Conversion of a Joint to a S-ODFConverting a congested joint into an S-ODF