Level 2 specification
NR/L2/TEL/30151
Design and installation of station cabling
Issue 1, 4 December 2010 · Cable route, survey & installation
Clause map — what each clause deals with
| 1 | Purpose | Aims — better cabling standards on stations |
| 2 | Scope | Design and installation of telecom cables and routes on stations |
| 3 | Definitions | Definitions |
| 4 | Roles and responsibilities | Roles — infrastructure manager, station facility owner |
| 5.1 | Site survey | GRIP 4 site survey scope |
| 6.1.1 | General | New routes — renew/expand existing first |
| 6.1.2 | Temporary installations | Temporary installations |
| 6.1.3 | Routing of new cable routes | Routing out of public view |
| 6.1.4 | Capacity in new cable routes | Capacity margins |
| 6.1.5 | Service life | Service life of station routes |
| 6.1.6 | Materials | Materials — sub-surface considerations |
| 6.1.7 | Cable tray | Cable tray use |
| 6.1.8 | Cable ties | Cable ties — cautions |
| 6.1.9 | Clipping cables directly to surfaces | Clipping single tails direct to surfaces |
| 6.2 | Existing cable routes | Using existing routes — appearance, capacity, ownership |
| 6.3 | Flexible conduit | Flexible conduit for tails |
| 6.4 | Working At Height Regulations | Working at height |
| 6.5 | Draw ropes | Draw ropes in spare pipes |
| 7.1 | Capacity | Future capacity in trunk cables |
| 7.2 | Cable types | Cable types for location/environment |
| 7.3 | Cabling for induction loops | Induction loop cabling — points to 30134 |
| 8 | Labelling | Cable labelling — ownership, service, destinations |
| 9 | Station locations | Location-by-location notes — platforms, roof voids, retail, canopies, booking hall, ticket office, equipment rooms, control room, lifts, bridges, refuges |