NR/GN/TEL/30138

Buried Cable Route and Cable Route Through Station Platform

Issue 1, 06 March 2010 · Cable route, survey & installation

Clause map — what each clause deals with

1PurposeGuidance for new buried cess routes and routes through station platforms
2ScopeWhat it covers
3DefinitionsDefinitions — buried duct route, buried station route, platform route
4Product ApprovalProduct approval — innovation allowed within NR approval
5Buried Duct RouteThe components of a buried duct route
5.1Straight SectionStraight section layout
5.2Duct ConfigurationsDuct configurations — trench, bedding, backfill
5.3ChambersChambers for buried routes
5.3.1Chamber to Surface Laid Troughing InterfaceChamber to surface troughing interface
5.3.2Draw RopeDraw rope
5.3.3Screening CableScreening cable in AC areas
5.4Buried Duct Route Design and ConstructionDesign and construction references for buried duct route
5.4.1Structural AdequacyStructural adequacy and service life
5.4.2Signage for Buried Duct RouteSignage for buried routes
6Design Considerations For New Station RouteThe two concepts for station routes — buried in platform vs platform route
6.1Approval in PrincipleApproval in principle for station routes
6.2Buried Station Route Design and ConstructionBuried station route design and construction
6.3Platform Route Design and ConstructionPlatform route design — refuge zone and edge constraints
6.3.1Platform Route Interfacing To Cess Cabling RoutePlatform route down to the cess route

Standards this one points to