onestop

FTN design & development specification (D&D)

SP FTN (D&D) 015

Environmental Testing of Copper Cable Termination Practices

Issue 1, Apr 2002 · FTN D&D specs & typical drawings

Test specification used to compare candidate copper termination blocks (Mondragon VX, Telsplice, Entrelec, 2BA link, Weidmuller, Porta Systems) under damp-heat cycling in an unconditioned cabinet. Background to why the FTN chose the VX module for lineside cabinets.

Clause map — what each clause deals with

1IntroductionWhy termination practices were environmentally tested before FTN deployment.
2AbbreviationsAcronyms (ETSI, FTN, IDC, NAMAS).
3GlossaryDefinitions of moisture barrier, Employer and Supplier.
4ScopeTests replicate worst-case temperature and humidity a termination sees on the lineside.
5DeliverablesWhat the test coordinator must provide: venue, plan, method statement, tests, results, report, witnessing.
6The Test VenuePreference for an accredited independent test house and what it must offer.
7The SamplesThe six termination products under test.
8The TestsDamp-heat cyclic test regime in an IP65 cabinet: three cycles with desiccant, without, and doors open; test cable provided.
8.1Testing ConfigurationsMoisture barrier used as a virtual earth; per-sample wiring arrangements with diagrams.
8.1.1Sample 1: Mondragon VX ModuleThree VX modules on DIN rail, outer ones to the barrier, pair 1 on the middle.
8.1.2Sample 2: Telsplice ConnectorTelsplice crimp on pair 2.
8.1.3Sample 3: Entrelec BlockFour Entrelec blocks, outer ones to barrier, pair 3 on the middle two.
8.1.4Sample 4: Weidmuller BlockFour Klippon blocks arranged as for Entrelec, pair 4.
8.1.5Sample 5: 2BA Sliding Link Block2BA block mounting, link and barrier connections, pair 5 on crimped terminals.
8.1.6Sample 6: Porta Systems 10 Pair ModuleIDC module with all other pairs strapped to the barrier, pair 6 on module pair 5.
8.2MeasurementsInsulation resistance test voltage and the two readings per sample (A-B, A-barrier).
8.3Frequency of MeasurementsLogging intervals around the temperature fall and through each cycle.
9Calibration of Test and Measurement EquipmentCalibration standard and traceability of test gear.
10ResultsResolution of recorded readings and which two IR values to log per sample.
11DocumentationResult sets, equipment details and real-time plots of chamber and cabinet temperature and humidity.
12Management RequirementsContents of the test plan (venue, dates, cycle times, equipment, report date).
13ReferencesReferenced standards.