Manual Installation Of Telecommunications Cables

Issue 1, August 2007 · Cable route, survey & installation

Clause map — what each clause deals with

1PurposePrinciples for hand-installing all types of telecoms cable
2ScopePractices to follow when installing telecoms cables
4DefinitionsDefinitions — figure of eight and so on
5.1Responsibilities and safetyInstaller responsibilities and safety
5.2.1Cable routeRoute works before cabling starts
5.2.2Engineering lengths of cablesEngineering lengths — drums cut to surveyed lengths
5.2.3Direction of layDirection of lay
5.2.4Rewinding cableRewinding cable safely
5.2.5Cable loading and unloadingLoading and unloading drums
5.3.1Preparation for cable installation into surface laid troughingPreparing to lay into surface troughing
5.3.2Installation of cable into surface laid troughingLaying cable into surface troughing
5.3.3Preparation for cable installation into duct routePreparing for duct installation
5.3.4Installation of cable into ductsPulling cable through ducts and UTXs
5.3.5Handling cable in manholes and preparationsHandling cable in manholes
5.3.6Manhole duct allocation, consideration and preparationsAllocating ducts in manholes
5.3.7Duct routes and cable entering buildingsCables entering buildings — the screening conductor must never enter a building, cabinet or REB; oversheath treatment at entry
5.4Cables inside buildingsSecuring external cables inside buildings
5.5.1Record of cable layRecord of cable lay for the handover pack