FTN & GSM-R programme document
FTN&GSM-R QM WI 046
Detailed Site Survey Guidelines
Issue 01, Sep 2005 · FTN D&D specs & typical drawings
Work instruction for surveying and choosing GSM-R base station and FTN node sites: mandatory distance and siting criteria, desirable criteria, and the Excel site survey questionnaire with its panoramic photo requirements. Used by site surveyors and cell planners.
Clause map — what each clause deals with
| 1 | Purpose | What the work instruction covers: siting criteria for NTPO infrastructure and the survey information to submit. |
| 2 | Scope | Applies to locating GSM-R and FTN sites for safety, neighbours, property clearance and PDR. |
| 3 | Reference Documentation | Points to GT/TDINT100 distance criteria. |
| 4 | Definitions | NTPO, FTN, GSM-R, PDR, OHLE. |
| 5 | Responsibilities | Surveyors and cell planners responsible for siting within all criteria. |
| 6 | Site Survey Guidelines & Criteria | Parent clause for mandatory and general siting criteria. |
| 6.1 | Mandatory Requirements | Must-meet siting rules: NR land, separation from electrical plant, antennas, OHLE, rails, bonds, pylons, schools; signal sighting, tower height, coverage, site dimensions, node spacing, access. |
| 6.2 | General Requirements - Site Survey | Desirable criteria: not between tracks, away from listed buildings and housing, walking distances, near existing masts and power, conservation areas, SSSI, adjacent to existing troughing. |
| 7 | Site Survey Questionnaire | The questionnaire is an Excel worksheet completed electronically for upload to the central GSM-R and FTN database to drive clearance, PDR, access, possessions and power. |
| 8 | Appendices | Full questionnaire field list: site ID, location, mast type, adjoining land, topography, compound size, access, parking, electrical proximity, environment, power, photos, line IDs, ELR. |